Skip to content

Getting a new roof past your Clermont HOA

Most Clermont roofs sit inside a deed-restricted community with an architectural review committee, and the committee can make you take a roof off. Here is how approval works, what the submission contains, where shingle, metal and tile land, and which parts of it Pro Specialty Services does for you.

FL License
#CCC1335465

- Free · no obligation

Request your free estimate.

★★★★★5-Star Google Reviews(352) 747-1023
5.0
Google rating
Five stars on Google
7 yrs
Years local
Serving Lake County
10-yr
Max workmanship warranty
By roof tier; 1 year on repairs
48h
Estimate turnaround
Written, fixed price

- HOA Roof Approval · Clermont, FL

HOA roof approval in Clermont is not a formality. The city's housing was built almost entirely as deed-restricted subdivisions, and in Kings Ridge, Summit Greens, Heritage Hills, Legends, Esplanade at Highland Ranch and most of the rest, an architectural review committee (ARC, sometimes ARB or modifications committee) has the authority to approve the color, material and sometimes the profile of your roof before a shingle is ordered, and to require removal of what it did not approve. A roofer who skips that step is spending your money twice.

Pro Specialty Services is a Florida-certified roofing contractor (CCC1335465) in Eustis, about 40 minutes from Clermont, and ARC paperwork is a routine part of a replacement here. One thing we will say plainly, because we have looked: none of Clermont's communities publishes its current roof rules online. The governing documents and the current guidelines live with the management companies and change over time, so this page does not pretend to know your community's approved colors. It explains the process, what a submission needs, how the three roof materials fare, and how we handle it.

- Local service

Does your roof need HOA approval? Repair, like-for-like, change

Three situations, three answers, in nearly every Clermont community we have dealt with.

  • A repair in matching material, a pipe boot, a flashing, a slope of shingles in the same color, a handful of slipped tiles, almost never needs architectural review. It is maintenance. Check your documents; a few associations ask for notice of any exterior work, but approval is rare.
  • A full replacement in the same material and color usually does need a submission, even when nothing visible changes. The committee wants the product, the color and the contractor on record, and in communities where the association handles exterior painting, it wants the roof to work with the paint palette for the next several cycles.
  • Any change, a different shingle color, a switch from shingle to metal, a change of tile profile, a new ridge vent silhouette on a villa roof shared with a neighbor, needs approval, and this is where applications get denied.

The governing rule is in your declaration of covenants and the architectural guidelines adopted under it. Florida Statute 720.3035 requires that the standards an association enforces be in those documents; a committee cannot deny a roof on a preference that is written nowhere. Ask the management office for the current architectural guidelines and the ARC application form before you get bids; a free roof inspection in Clermont and the guidelines together are the two documents a roofer needs to quote correctly.

- Deep dive

What a Clermont ARC submission contains

The forms differ by community; the contents do not. A complete roof application typically needs:

  1. The association's application form, signed by the owner (not the roofer), with the lot and address.
  2. Manufacturer product data for the shingle, tile or metal panel: the brochure page with the product name and the manufacturer's color name.
  3. A physical color sample or chip, or a color board photograph when the committee accepts one. Monitor colors are not samples.
  4. The Florida Product Approval number for the roof covering, which the committee may not ask for but the permit office will, so it should be on the same page.
  5. The contractor's license number and certificate of insurance; many associations require both and some require the roofer to be registered with the management company before the first truck comes through the gate.
  6. A scope description: full tear-off or not, ventilation changes, any change to ridge or hip profile, and for metal a drawing or photo rendering of the panel profile and trim.
  7. For attached homes (Kings Ridge villas, duplex and triplex units), a note on the shared roof plane and, where the documents require it, the neighbor's acknowledgment.

We prepare items 2 through 7 for every Clermont replacement estimate as a matter of course, and we fill in the application for you to sign. What we do not do is guess at the approved list from memory; we ask the management office for the current guidelines in writing, every time, because the list changes and the roof outlasts the list.

- Free inspection

Get a written answer on your Clermont roof.

- Deep dive

Shingle, metal and tile: how each one fares with Clermont committees

Without quoting any community's rules, here is the pattern across the subdivisions we work in.

Architectural shingleMetalConcrete or clay tile
In the 1995 to 2010 shingle subdivisions (Kings Ridge, Summit Greens, Legends, Southern Fields, Hartwood Reserve, Heritage Hills)The expected material. Approval is about color: most palettes allow a range of grays, browns and weathered-wood blends.Varies. Some communities allow standing seam in low-gloss earth tones and prohibit exposed-fastener panels; some prohibit metal outright; some have never been asked. Expect a longer review and a request for a rendering.A change to tile is rarely approved on a shingle street, and the trusses may not carry the weight anyway.
In tile communities (Esplanade at Highland Ranch, tile streets in Heritage Hills and Legends)Usually prohibited as a change from tile.Usually prohibited.Required. Approval is about matching the community profile and color; a re-lay over new underlayment with the same tile rarely needs more than notice.
Attached homes and villasMust match the attached unit; the committee may require both halves to be done together or in the same product.Rarely approved on a shared roof plane.Same as shingle: match the neighbor.
Lakefront and acreage parcels with no HOA (parts of the Lake Minneola and Johns Lake shorelines, non-deed-restricted Four Corners parcels)No ARC. The permit office is the only approval.

Two more notes from the field. First, communities where the association repaints exteriors on a schedule, which includes Kings Ridge and Heritage Hills, care most about color harmony, because the roof will outlast several paint cycles; bring the current paint palette to the color decision. Second, if your guidelines rule out metal, we quote the shingle they allow and say why rather than sell a roof the committee can order removed. The metal roofing in Clermont page has the longer version of how a metal application goes, and the shingle roofing in Clermont page covers color and product choices on the common material.

- Deep dive

Timelines: build the committee into the schedule

ARC review is the slow step of a Clermont roof, and the schedule has to be built around it rather than fought.

  • Committees meet on a cycle, monthly in many communities, and a submission that misses the agenda waits for the next one. Ask the management office for the meeting date and the submission deadline before it.
  • Review windows are in the documents. Most declarations give the committee a set number of days to respond; read yours so you know when silence becomes a question.
  • Nothing is ordered until approval is in writing. Shingle color is a special order on a 25-square roof; material bought before approval is material you may own twice.
  • Storm damage is the exception that is not an exception. An emergency tarp or dry-in needs no approval; the permanent roof does. After a county-wide event like Milton, committees are flooded and slower, which is one more reason to document the damage, tarp, and get the application in the same week.
  • Insurance renewal dates do not move for the committee. If a renewal letter has given you a deadline, start the ARC process the day the inspection report comes back, not the day the estimate is signed.

Our rule on sequencing: inspection, written estimate with product data, ARC application the same week, approval in hand, then the permit, then material. The Clermont roof permits guide covers the permit step, which is faster than the committee in both of Clermont's permit offices.

- Deep dive

What Florida law requires of the association

Homeowners usually know the committee has power over them. Fewer know the limits Chapter 720 of the Florida Statutes puts on the committee.

  • The standards have to be written down. Florida Statute 720.3035 provides that the architectural standards an association enforces must be the ones in its declaration or in written guidelines adopted under it. A denial based on an unwritten preference is open to challenge.
  • Denials have to be specific. Since July 2024, the same statute requires an association that denies an architectural request to tell the owner in writing which rule or covenant the denial rests on. "The committee did not like it" is not a lawful denial; "Section 7.3 limits roofing to the approved palette, and the submitted color is not on it" is.
  • Solar is protected. Florida Statute 163.04 bars any deed restriction or association from prohibiting solar collectors; an association may direct where on the roof they go only if the alternative does not impair performance or raise the cost. If panels are coming off and going back on for your re-roof, or going on for the first time, the committee can ask about placement but not say no.
  • Maintenance is not a change. Covenants regulate alterations; replacing a failed roof with the same product is maintenance in most declarations, which is why like-for-like applications are almost never denied.

None of this is legal advice and the declaration for your community controls; it is the set of questions worth asking when a submission comes back with a no.

- Deep dive

How Pro Specialty Services handles the ARC on a Clermont roof

  1. At the free inspection we ask for the community name and the management office contact, and we ask whether the roof plane is shared with a neighbor.
  2. Before quoting a color or a profile we request the current architectural guidelines and the application form from the management office in writing.
  3. The estimate names each product by manufacturer, product and color, with its Florida Product Approval number, so the same document serves the committee and the permit office.
  4. We assemble the submission: product data, color chip, license and insurance, scope and, for metal, a rendering. You sign the application; we deliver it or upload it to the management portal.
  5. We wait for the written approval and do not order material until it is in hand. If the committee asks for a different color or product, we revise the estimate at no charge.
  6. Gate access: the day before work we send the guardhouse our crew names and the truck description so repair day is not spent at the gate.
  7. Permit after approval, from the right office for your parcel, then material, then the roof.

One thing we will not do is install a roof the committee can order removed. If the guidelines say no, we say so and quote what they allow. The about Pro Specialty Services page has the rest of what we will and will not do.

- Free estimate

Request your free estimate

Clermont, FL · or call (352) 747-1023

Get my free estimate

- Inspections

Free roof inspection

We get on the roof, photograph every problem area and hand you written findings. No charge, no pressure, anywhere in Clermont.

Book a free inspection →

- Financing

Financing available

Ask about financing during your estimate. Homeowner projects only.

About financing →

- Where we work

Clermont neighborhoods we serve →

Minneola · Groveland · Montverde · Mascotte

- Ready when you are

Free roof inspection in Clermont.

5.0

Rated on Google

Every one is a real Google review you can open and read yourself.

- FAQ

HOA and ARC questions from Clermont homeowners

Don't see what you're looking for? Give us a call - the owner picks up.

- Prefer to talk?

(352) 747-1023

Mon-Fri · 8am-5pm

Tap to call
In most Clermont communities, yes, even when nothing visible changes: the committee wants the product, color and contractor on record. A repair in matching material almost never needs approval. Read your declaration and ask the management office for the current guidelines; we prepare the submission for every replacement estimate as a matter of course.
It depends on the community's written guidelines, which live with the management company and change. Some allow standing seam in low-gloss earth tones and prohibit exposed-fastener panels; some prohibit metal entirely. We request the guidelines in writing before quoting a profile or color, and if they say no, we quote the shingle they allow instead of selling a roof the committee can order removed.
Committees in many Clermont communities meet monthly, and the review window is set in your declaration. Plan on the committee being the slow step: submit the week the estimate is signed, do not order material until approval is in writing, and if an insurance renewal deadline is involved, start the application the day the inspection report comes back.
If the color is outside the written palette in the governing documents or adopted guidelines, yes. Florida Statute 720.3035 requires the standards to be written and, since July 2024, requires a denial to state in writing the specific rule or covenant it rests on. Ask the management office for the approved palette before choosing; most allow a range of grays, browns and weathered-wood blends.
The owner signs it; we assemble it. For every Clermont replacement estimate we gather the manufacturer product data, a color chip, our license and certificate of insurance, the scope and, for metal, a rendering, and fill in the association's form for your signature. We deliver it or upload it to the management portal and wait for written approval before ordering anything.
An emergency tarp or dry-in is not an alteration and needs no approval; the permanent roof does. We secure the roof, document the damage with dated photographs, and get the application in the same week, because committees are slower after a county-wide storm. The permanent repair or replacement waits for the written approval and the permit.
Booking this week in Clermont

Get an estimate your committee can approve

Product data, color chip, license, insurance and Florida Product Approval numbers on one document, prepared for your ARC. Free inspection first.

5-star ratedLicensed & insured